• Water and chemicals

    No.Name of ProjectLocationClientProject TypeStart date End date
    1Water Supply Riyadh 3 – Wasia – Buildings & Mechanical Networks
    Mechanical, Electrical, Civil & ARCH Design works for Buildings / Networks
    COATAQAH – National Water Company “NWC”Water treatment Plant20182019
    2Water Supply Riyadh 3 – Wasia –Electrical Systems,
    Mechanical, Civil & ARCH Design works for new 33 kV switchgear Building & Design works for OHTL / UGC between different areas of project
    COATAQAH – National Water Company “NWC”Water treatment Plant20172019
    3Assessment of the environmental conditions of the proposed wastewater projects (sewage networks, force mains
    and PS and wastewater treatment plants: new constructions and Upgrade) in two districts in Kafr El-sheikh governorate (Desouq and Motobus).
    Financed by EBRD European Bank for Reconstruction and
    Development
    Cairo
    EGYPT
    ARUPHydraulics20132014
    4ESIA study for the landfill of El- Kharg City in Riyadh region.
    The study included field measurements of air quality, water quality and soil quality. The assessment included the proposed recycling.
    Riyadh
    KSA
    EL-MOHAYED –
    MISR Consult

    Environment20132013
    5Environmental and Social Impact Assessment for the PROPOSED Safaga Desalination Plant.
    The study emphasized the 20,000m3/day brine disposal system and their environmental impact on the environment.
    The purpose of the ESIA report is to obtain permitting from the Egyptian environmental Affairs Agency EEAA.
    Cairo
    EGYPT
    MISR Consult
    for Environment
    &
    Infrastructures
    (Branch Office)
    Hydraulics20132013
    6Environmental and Social Impact
    Assessment for the PROPOSED Al- Yousr Desalination Plant (treated water capacity 40,000m3/day). The study emphasized the 120,000m3/day brine disposal system and
    their environmental impact on the environment.
    The study also included hydraulic study for the intake lines from the sea as well as disposal system to the deep marine waters. The purpose of the ESIA report is to obtain permitting from the
    Egyptian Environmental Affairs Agency EEAA.
    Cairo
    EGYPT
    MISR Consult
    for Environment
    and
    Infrastructures
    (Branch Office)
    Hydraulics20132013
    7Environmental and Social Impact
    Assessment for the PROPOSED Wastewater Treatment Plant in
    KENANAH Compound project owned and operated by ORASCOM Cooperative ousting Company.

    The purpose of the ESIA report is to obtain permitting from the Egyptian Environmental Affairs Agency EEAA.
    Cairo
    EGYPT
    ORASCOM
    For Cooperative Housing
    Hydraulics20122012
    8Technical support and capacity building services to the Four Affiliated Companies of the Holding company of water and wastewater HCWW in Gharbia, Sharkia, Behaira and Damietta Governorates.

    in close coordination with the short term
    International EIA expert and senior water/wastewater key expert.
    Cairo
    EGYPT
    RODECOGmbH,
    Germany –
    HCWW Holding
    Company for Water
    and Wastewater
    Hydraulics20112014
    9Environmental and Social Impact Assessment for the EXISTING Wastewater Treatment Plant in Haram City Compound owned and operated by Orascom Cooperative Housing Company,

    The purpose of the ESIA report
    is to obtain permitting from the Egyptian Environmental Affairs
    Agency EEAA.
    Cairo
    EGYPT
    ORASCOM
    For Cooperative Housing
    Hydraulics20112011