  Completed Projects
 
 

1

Construction of 132/33/13.8KV substation with 7 No.s 132KV outdoor bays, 2 No.s 133MVA transformers, 9 bays of 33KV switchgear, 13 bays of 13.8KV switchgear and auxiliary systems

Bisha South

SEC-SOA

2002

2

Construction of 132/33/13.8KV substation with 7 No.s 132KV outdoor bays, 2 No.s 83MVA transformers, 9 bays of 33KV switchgear, 9 bays of 13.8KV switchgear and auxiliary systems

Tanouma

SEC-SOA

2003

3

Construction of 132/33/13.8KV substation with 7 No.s 132KV outdoor bays, 2 No.s 133MVA transformers, 13 bays of 33KV switchgear, 13 bays of 13.8KV switchgear and auxiliary systems

Baha East

SEC-SOA

2003

4

Construction of 132/33/13.8KV substation with 7 No.s 132KV outdoor bays, 2 No.s 133MVA transformers, 13 bays of 33KV switchgear and auxiliary systems

Aqiq

SEC-SOA

2004

5

Construction of 2X15 MVAR 132KV Capacitor Banks including one GIS bay with connected protection and control systems

Qilwah S/S

SEC-SOA

2004

6

Extension of 33/13.8KV substation consisting replacement of transformer with 2X20MVA, retrofit of 5 No.s 33KV switch gears, 8 Nos. 13.8KV switchgears, extension of 4 bays of 13.8KV switchgears, erection of auxiliary transformers, LVAC panels, etc.

Tandaha

SEC-SOA

2004

7

Extension of 33/13.8KV substation consisting replacement of transformer with 2X20MVA, replacing 7 No.s 33KV switch gears and  9 Nos. 13.8KV switchgears.

Zafeer

SEC-SOA

2005

8

Construction of 132/33/13.8KV substation with 24 bays 132KV GIS, 2 No.s 133MVA transformers, 15 bays of 33KV switchgears, Relocation of 7No.s 132KV feeders from existing substation, supply and installation of connected control and protection, Scada, SER, FR, and auxiliary systems

Jizan CPS 2

SEC-SOA

2005

9

Reinforcement of 132/13.8KV substation with extension of one 132KV outdoor bay, replacing of two transformers with 67MVA, 132/13.8KV transformers and supply of one transformer 67 MVA, supply and installation of 42 bays of 13.8KV switchgear, with connected control and protection systems

KKAB, Khamis Mushait

SEC-SOA

2005

10

Reinforcement of 132/33/13.8KV substation consisting of replacement of two transformers with 133MVA, 132/33/13.8KV transformers, supply and installation of 19 bays of 13.8KV switchgear, 4 bays of 33KV switchgear with connected control and protection systems

Baish

SEC-SOA

2006

11

Reinforcement of 132/13.8KV substation consisting of replacement of two transformers with 67MVA, 132/13.8KV transformers, supply and installation of 22 bays of 13.8KV switchgear  with connected control and protection systems

Oukdud

SEC-SOA

2006

12

Reinforcement in various substations consisting supply and installation of 7 bays of 33KV switchgear and 9 bays of
13.8KV switchgears  with connected control and protection systems

Jizan Town, Sabya, Abu Arish, Abha East& Bisha Town

SEC-SOA

2006

13

Extension of two 132KV substations consisting extension of 12 No.s 132KV outdoor bays, 2No.s 60MVA,132/13.8KV transformers,  14 bays of 13.8KV switchgears  with connected control and protection systems and auxiliaries.

Dahran al Janoub and Al Khaniq

SEC-SOA

2007

14

Extension of 3No.s 132KV outdoor bays and installation of 2X20 MVAR capacitor banks with connected control and protection systems and auxiliaries.

Baha East

SEC-SOA

2007

15

Supply and installation of 2X15 MVAR, 33KV capacitor banks with connected control and protection systems and auxiliaries.

Aqiq

SEC-SOA

2007

16

Extension of 33/13.8KV substation consisting supply and installation of one 25MVA transformer, 5 No.s 33KV switchgears, 7 No.s 13.8KV switch gears, SCADA and communication system, connected control & protection

Al Laith

SEC-WOA

2007

17

Extension of 132/33/13.8KV substation consisting replacement of two transformers with 2x133MVA, 132/33/13.8KV and supply and installation of 19x13.8KV switchgear bays with connected control and protection systems

Jizan Town

SEC-SOA

2007

18

Extension of 132/33/13.8KV substation consisting replacement of two transformers with 2x133MVA, 132/33/13.8KV and supply and installation of 19x13.8KV switchgear bays with connected control and protection systems

Sabya

SEC-SOA

2007

19

Extension of 132/13.8 KV substations with supply and installation of 22x13.8KV switchgears with connected control and protection systems.

Tabouk 1& 7

SEC-WOA

2007

20

Extension of 110/13.8 KV substations with supply and installation of 11x13.8KV switchgears with connected control and protection systems.

Madinah& Haram 2

SEC-WOA

2007

 

 
LINE OF BUSINESS
 
 

JEC provides Design, Consultancy,
Projects Management & Planning Services in different engineering disciplines, Read More

 
 
 